
info@juzhikan.asia
中国电建集团海外投资有限公司,北京,100037;
摘要:梯级水电站通过水文联系、调度关系和区域电网形成紧密关联,局部事件可能沿流域传递并影响多个电站。基于系统性环境风险理论和老挝南欧江项目实践,分析水文、工程运行、生态社会和跨境治理四类风险,提出流域监测预警、梯级联合调度、分级应急协同、环境社会管理和跨境信息合作机制。以流域为管理单元有助于改善单站管理的局限,提高海外梯级水电站防范极端事件和维持稳定运行的能力。
关键词:梯级水电站;流域安全;系统性风险;联合调度;南欧江
参考文献
[1] BI J, YANG J, LIU M, et al. Toward systemic thinking in managing environmental risks[J]. Engineering, 2021, 7(11): 1518-1522.
[2] ADHIKARI S, SOPIN J, TECHATO K A, et al. A systematic review on investment risks in hydropower to developing sustainable renewable energy systems[J]. International Journal of Energy Economics and Policy, 2023, 13(2): 222-230.
[3] ZHU B, LIN J, LIU Y, et al. Multi-risk interaction analysis of cascade hydropower stations based on system dynamics simulation[J]. Water Resources Management, 2024, 38: 45-62.
[4] YANG Y, XU Y, WANG N, et al. Impacts of cascade hydropower dam construction on riparian vegetation in the Yalong River Basin[J]. Environmental Monitoring and Assessment, 2025, 197(9): 1050.
[5] ZHANG Y, CHEN Q, WANG R, et al. A study of operational safety risk identification of a cascade reservoir group: Bayesian network-based risk identification for cascade hydropower stations[J]. Sustainable Energy Technologies and Assessments, 2021, 48: 101583.
[6] ZHANG H, LI Z, GE W, et al. Cascade failure risk analysis of mixed reservoirs based on disaster spreading theory[J]. International Journal of Disaster Risk Reduction, 2024, 111: 104711.
[7] HE S, LI B, LI Q, et al. Refining hydropower operation by dynamic control of cascade reservoir water levels with flood season segmentation[J]. Energy, 2025, 314: 134156.